Printed on: Sept 17, 2025 11:41 am IST
The court docket directed the Delhi Growth Authority (DDA) to pay hire to the residents, a ten% annual increment, so long as they get the reconstructed flats
The Delhi excessive court docket on Wednesday refused to remain the demolition of the Signature View Flats (SVA) and requested over 100 households residing there in Delhi’s Mukherjee Nagar to vacate till October 12.

A bench of Chief Justice DK Upadhyay and Justice Tushar Rao Gedela directed the Delhi Growth Authority (DDA) to pay hire to the residents, a ten% annual increment, so long as they get the reconstructed flats. It requested the DDA to determine a camp workplace inside the SVA premises to help residents with documentation and different formalities associated to the vacating and handing over of their flats inside two days.
The court docket permitted residents to take their belongings, together with toilet fittings and electrical gadgets. It requested the DDA to undertake the demolition, inflicting minimal inconvenience. “…the keep of the residents for any interval underneath this order shall be at their very own dangers… for the explanations already assigned in our earlier order dated seventh August.”
The court docket requested DDA’s employees to assist with the holiday and never insist on minor particulars. An in depth copy of the decision was awaited.
The order was handed in DDA’s petition difficult a single decide’s December order rejecting the company’s proposal of establishing 168 further flats through the use of an enhanced flooring space ratio. It had permitted the demolition and reconstruction of the towers, saying that the constructing was harmful and unsafe for habitation. The court docket had directed the residents to vacate the flats inside three months.
The residents submitted that they had been able to vacate the flats however urged the court docket to restrain the DDA from demolishing the construction and floating tenders for its demolition and reconstruction. DDA’s counsel, Sanjay Jain, urged the court docket to move an order to vacate the flats, in compliance with the only decide’s December ruling.
The identical bench additionally rejected a petition of one of many residents difficult Justice Mini Pushkarna’s August 6 order, dismissing the applying searching for evaluate of the December ruling.
The 336 flats had been constructed between 2007 and 2010. Their structural security raised considerations after a number of years of allocation. The Municipal Company of Delhi in 2023 issued the demolition orders, calling them structurally unsafe based mostly on an Indian Institute of Know-how Delhi report.
[ad_2]