Bengaluru, the IT hub of Karnataka and the Silicon Valley of India, has one of many largest information centre infrastructures within the nation after Mumbai and Chennai. The info centre market in Bengaluru is projected to develop from 203.17 MW in 2025 to 398.22 MW by 2031, with an 11.87% CAGR.
However as demand for AI-ready compute grows, and with new pressures on sustainability, the crucial query of growth past Bengaluru is surfacing. Can Karnataka broaden its information centre footprint into rising hubs akin to Mangaluru, Hubballi, and Mysuru?
The reply lies on the intersection of power and water safety, ecosystem constructing, and the rise of edge computing. Policymakers, traders, and trade leaders are lastly converging round this theme.
Vitality and Water Safety: The Vital Bottl
[ad_2]
Leave a Reply